No. Project Client Contract Price
(RM)
Completed
Date
1 Construction of Telekom Substation at Pulau Jerejak, Penang (including cable laying). Penang Shipbuilding & Construction Sdn Bhd 270,000 Sep 1996
2 Sabah Gas Metering Skid Project at Sungai Buluh, Selangor. HL Engineering (M) Sdn Bhd 350,000 Dec 1996
3 Reinforced Concrete Pile caps and Slab Deck Works at JB Water Front. Pilecon Geotechnics Sdn Bhd 570,000 Apr 1997
4 Project Management for Road Works from Jelapang to Chemor in Kinta District, Perak. Greenhands Construction Sdn Bhd 150,000 Aug 1997
5 Construction of RC Wall for 2 units of Accommodation Module in Pulau Jerejak, Penang. PSCI – Naval Dockyard Sdn Bhd 680,000 Mar 1999
6 Construction and Completion of Civil/Building Package (Package-1) for Putrajaya District Cooling Plant, Selangor. Nam Fatt Construction Sdn Bhd 1.1 Million Apr 1999
7 Deep Excavation (B09) at Preheater Basin in Manjung Power Plant. Leighton Contractors (M) Sdn Bhd 150,000 Jan 2002
8 44 units of double-storey terraced houses on lot10638 -10650, Lot 10687-10700 and Lot 10715-10731, In Mukim Durian Sebatang, Daerah Hilir Perak. Sunny Triumph Development Sdn Bhd 3.5 Million Sep 2002
9 8 units of Double Storey Terrace Houses for Phase 2A, Taman Cahaya in Teluk Intan, Perak Sunny Triumph Development Sdn Bhd 650,000 Dec 2003
10 29 units of Double Storey Terrace Houses for Phase
2B, Taman Cahaya in Teluk Intan, Perak
Sunny Triumph Development Sdn Bhd 2.32 million Dec 2004
11 Supply , Install and Construct a Paintball Field for ‘Natural Heritage Orchard & Country Resort’ on Mukim Kuala Linggi, Daerah Alor Gajah, Melaka Bandaraya Bersejarah. Sri Lingga Sdn Bhd 203,000 Mar 2007
12 119 units mix developments at Taman Panglima in Teluk Intan, Perak Sunny Triumph Development Sdn Bhd 9.5 million Sep 2007
13 Earthwork and sand works for Laluan Dari Pasir Panjang ke Linggi, Negeri Sembilan Techniques Geosystems Sdn Bhd 11 million Dec 2007
14 Cadangan Sambungan Jalan Keluar Dan Masuk Dari Elevated U-Turn Diatas Sebahagian Lot PT292, Bandar Sunway, Mukim Petaling, Selangor, Untuk Taylor’s College S/B Dengan Kebenaran Dari Majlis Perbandaran Subang Jaya. 3 Face Sdn Bhd 8.4 Million Aug 2010
15 Relocation  Water  Tank Works For The Proposed Perdana  University Development  At  Serdang, Selangor For Academic  Medical  Centre  Sdn Bhd Chase Perdana  Sdn Bhd 2.75 Million Jun 2013
16 Package No. 1 JN/F01 Main  Civil Works For Coal Handling Facilities & Building and  Cooling Water Electrical Building For The Development Tanjung Bin 4-1 x 1000 MW Coal Fired  Power Plant Project At Negeri Johor Mudajaya Corporation Berhad, 17.4 Million Dec 2013
17 Proposed Drainage And Sewerage For New 18 Holes Desaru Valley Golf Course In Desaru, Johor Darul Takzim Chase Perdana Sdn Bhd 13.0 Million Nov 2015
18 Cadangan Pembinaan Bangunan Tapak Baru Sekolah Jenis Kebangsaan Tamil (SJKT) Ladang Valdor, Sungai Jawi, Pulau Pinang (Reka & Bina) Kementerian Pelajaran Malaysia 9.64 Million On-Going
No. Project Client Contract Price (RM) Completed Date
1 Removal of Slope Sand Surcharge at Lekir Coastal Development, Manjung Power Plant, Manjung Perak. Van Oord ACZ (M) Sdn Bhd 1.4 Million Jul 1999
2 Rock Revetment Works at Lekir Coastal Development, Manjung Power Plant, Manjung, Perak. Van Oord ACZ (M) Sdn Bhd 17.0 Million Jul 1999
3 Construction of Outfall Channel Structure in Manjung Power Station, Sitiawan, Perak. Leighton Contractors (M) Sdn Bhd 5.4 Million Jan 2002
4 Rock Reinstate Works at CW Intake in Manjung Power Plant. Leighton Contractors (M) Sdn Bhd 120,000 Nov 2001
5 Construction of Slope Protection System to Ash Pond Bunds Peremba Construction Sdn Bhd 2.25 Million Sep 2002
6 Kerja-kerja Perlindungan & Pengindahan Tebing Sg. Johor di Kota Tinggi, Johor ACPI Precast Solutions Sdn Bhd 6.5 Million Dec 2003
7 Projek untuk Memulih, Mengindah dan Melindungi Pantai di Port Dickson, Negeri Sembilan Dengan Kaedah ‘Beach Management System’ Apex Beach Management Sdn Bhd 1.8 Million Jun 2004
8 Proposed 2 x 700 MW Coal Fired Power Plant Project Jimah , Negeri Sembilan. – Subcontract Works for Shore Protection Works. Taisei Corporation 6 Million Jun 2007
9 Projek Menaiktaraf Sistem Saliran Sg. Rasau Fasa II, – Kolam Takungan Banjir di atas Lot 336 & Kerja – Kerja berkaitan ( Pakej A ). Jabatan Pengaliran dan Saliran, Selangor 11.6 Million Feb 2010
10 Cadangan Pembangunan Menyeluruh Pantai Kok, Teluk Burau Di atas Lot PT21-30, Mukim Padang Mat Sirat Daerah Langkawi.(Phase 1B- Fisherman Wharf – Nelayan Lagoon), Kedah Benua Mahsuri Sdn. Bhd. 15.5 Million Aug 2016
11 The Construction, Completion And Maintenance Of Shoreline Protection Works At The Offshore Civil Work For Jimah East Power 2x1000mw Coal Fired Power Plant Project. Taisei Corporation 11.4 Million On-Going
No. Project Client Contract Price

(RM)

Completed

Date

1 Dredging at the Waterfornt of PSC’s Yard, Pulau Jerejak, Penang. Penang Shipbuilding & Construction Sdn Bhd 3.23 Million Jul 1996
2 Reclamation at Lumut Industrial Port Area (Project in J.V. with Ballast Nedam Groep N.V. (M) Sdn Bhd). Lumut Maritime Terminal Sdn Bhd 12.5 Million Nov 1996
3 Reclamation at Lumut Industrial Port Area – Phase 2, Perak (Project in J.V. with Perangsang International Sdn Bhd). Lumut Maritime Terminal Sdn Bhd 4.45 Million Mar 1997
4 Dredging Work in Load-Out Front in Teluk Ramunia, Johor. Promet Fabricators Sdn Bhd 1.26 Million Apr 1998
5 Dredging Work in Load-Out Front in Teluk Ramunia, Johor. Sime Sembawang Engineering Sdn Bhd 120,000 May 1998
6 Proposed 2 x 700 MW Coal Fired Power Plant at Kuala Lukut, Mukim Jimah, Port Dickson, Negeri Sembilan Darul Khusus. – Working Platform Preparation for Ground Improvement for Intake Channel. Taisei Corporation 250,000 Jul 2007
7 Dredging work at the waterfront of Oilfab’s Yard, Pulau Indah Industrial Park – West Port, Selangor. Intraline Resources Sdn Bhd 2.7 Million Sep 2007
8 Dredging Work Underneath 3000 Tons Shiplift at Basin Area For MESSR Boustead Naval Shipyard Sdn Bhd, Pangkalan TLDM, Lumut, Perak Macro Jaya Marine Engineering Sdn Bhd 6.62 Million Oct 2013
9 Dredging Works For Cooling WaterOutfall Tanjung Bin 4-Cooling WaterIntake  and outfall   Project, Tanjung
Bin, Johor
Murray and Robert Marine Malaysia- Leighton Contractors (Malaysia) Joint Venture 13.0 Million Dec 2013
10 Proposed 2 x 700 MW Coal Fired Power Plant Project Jimah , Negeri Sembilan.       – Subcontract Works for Construction Completion and Maintenance of the Cooling Water Intake Channel. Taisei Corporation 14 Million Jul 2008
11 Proposed 2 x 700 MW Coal Fired Power Plant at Kuala Lukut, Mukim Jimah, Port Dickson, Negeri Sembilan Darul Khusus. – Backfilling Works for Offshore Outfall Culvert. Taisei Corporation 2 Million Jul 2008
No. Project Client Contract Price

(RM)

Completed

Date

1 Supply, Lay and Fix Land and Submarine Pipeline and Associated Works From Lebuhraya Bayan Baru to Pulau Jerejak, Pulau Pinang Perbadanan Bekalan Air Pulau Pinang Sdn Bhd (PBA) 19 Million Apr 2006
2 Supply and Lay 600MM Steel Submarine Pipeline
3.1KM from Teluk Batik to Pangkor Island.
Lembaga Air Perak 21 Million May 2009
3 Proposed HDPE Submarine Pipe Crossing At Batang Paloh, Mukah Division, Sarawak, (Design And Build) PPES Works (Sarawak) Sdn Bhd 12.5 Million Apr 2011
4 Proposed 500KV Transmission Line Diversion From Existing U1, U2, U3 Janamanjung. Construction of Construction of Sand Bund Access AP1, AP1/1 and AP2. Trenergy Infrastructure Sdn Bhd 3.05 Million Dec 2011
5 Projek Membina Dan Menyiapkan Bekalan Air Luar Bandar (Balb) Sambungan Bekalan  Air Pusa Ke Beladin Bahagian Betong, Sarawak Puncak Niaga (M) S/B     Lot 10864, Section 64 KTLD, Jalan Mendu 93200 Kuching Sarawak 12.1 Million Jun 2012
6 Proposed Construction Of Twin 1100 MM ND Raw Water Submarine Pumping Main Crossing Major Rivers (7 NOS) – Dredging & Back Filling works PPES Works (Sarawak)  Sdn Bhd 15.0 Million Sep 2015
7 Proposed Construction Of Twin 1100 MM ND Raw Water Submarine Pumping Main Crossing Major Rivers (7 NOS) Sibu Water Board Sarawak 79.0 Million Sep 2015