PROJECT DATA SHEET - RM 19

PROJECT NAME:

SUPPLY & LAY 600MM STEEL SUBMARINE PIPELINE 3.1KM
FROM TELUK BATIK TO PANGKOR ISLAND
CLIENT :

LEMBAGA AIR PERAK

LOCATION:

TELUK BATIK-PULAU PANGKOR, PERAK,MALAYSIA

 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

SERVICE PROVIDED:

SUBMARINE PIPELINE

APPROXIMATE CTC VALUE:

RM 21 MILLION

START DATE:

FEBRUARY 2008

COMPLETION DATE:

MAY 2009

PROJECT DESCRIPTION:


The Contract for the Project,Supply and Laying of 600mm Steel Submarine Pipilines from Teluk Batik to Pulau Pangkor, Perak,Malaysia is one of the projects set off under the Malaysian Nineth Plan- 'RMK 9'( Rancangan Malaysia Kesembilan)

Wibawa Works was engaged by Lembaga Air Perak for the 600mm Steel Submarine Pipeline Project to create a new water pipeline to Pualau Pangkor.The Project involved aupply and lay of submarine 600mm steel pipeline from Teluk Batik to Pulau Pangkor,Perak at a distance of 3.2km.

The planned submarine water pipeline are laid in Dinding Channel towards southern southern corridor on the mainland from Teluk Batik to Pulau Pangkor within the Non-Anchorage Zone.

The main elements engaged in the installation of the submarine section are :

- Installation of winch and associated works near shore tie-in pit at the Pulau Pangkor site
- Procurement Of Steel Pipes
- Reclamation for Launch Yard establishment
- Launchway and winch fabrication set-up
- Dredging and cable laying works
- Shore to shore pull, utilizing "Bottom Pull Method"
- Hydrostatic & Pigging Operations

OTHER SIMILIAR PROJECTS:submarine_pipeline_penang

submarine_pipeline_sarawak

submarine_pipeline_lap

WIBAWA WORKS SDN BHD
37-5 Block H, Jalan PJU 1/37, Dataran Prima, Petaling Jaya          Selangor, Malaysia
Phone :   +603 7804 8066
Fax :        +603 7804 8193
Email:      wibawaworks 'at' wibawa.com.my